Design and prepare and fit new front panel with optimized arrangement of components. Mounting components on the panel and connecting them.
Please find more about installation of the front panel here
Design and prepare and fit new front panel with optimized arrangement of components. Mounting components on the panel and connecting them.
Please find more about installation of the front panel here
Organizing orderly and systematic cable routing, mounting central terminal block and connecting and documenting consumers.
Please find more about installation and wiring components here
First, remove all existing components, get an overview, determine what is still needed, sort out, create space, plan and prepare the substrate.
Please find more about cleaning up and analysis here
M | T | W | T | F | S | S |
---|---|---|---|---|---|---|
1 | 2 | 3 | ||||
4 | 5 | 6 | 7 | 8 | 9 | 10 |
11 | 12 | 13 | 14 | 15 | 16 | 17 |
18 | 19 | 20 | 21 | 22 | 23 | 24 |
25 | 26 | 27 | 28 | 29 | 30 |
Copyright © 2024, Calypso Yacht Technik. Proudly powered by WordPress. Blackoot design by Iceable Themes.